Case Study — Utility-Scale Renewable Energy

Single-Mode Fibre Splicing, Testing & Certification for a 49 MW Solar Farm

Omni3 was engaged as a specialist subcontractor to complete fibre communications termination, fusion splicing, testing and certification on a 49 MW utility-scale solar farm in Essex — approximately 220 single-mode fibre connections forming the communications backbone between distributed BESS equipment, SCADA systems and the central operations environment.

49 MW

Utility-scale solar farm, Essex

~220

Single-mode fibre connections

Fusion spliced & certified

OTDR and optical loss tested

BESS / SCADA

Communications backbone completed

Project context

Omni3 was engaged as a specialist subcontractor to complete fibre communications termination, fusion splicing, testing and certification on a 49 MW utility-scale solar farm in Essex. The project was delivered for a major engineering and energy contractor acting as principal contractor on the site.

A utility-scale solar farm of this scale requires reliable communications infrastructure to connect distributed equipment — battery energy storage systems, inverters, protection devices and monitoring systems — back to a central control and operations environment. The quality and integrity of the fibre communications links are critical to the operation and monitoring of the site.

The single-mode fibre cable had already been installed across the site before Omni3's involvement. Omni3's role was to complete the fibre connections: fusion splicing, termination, testing and certification across approximately 220 connections distributed throughout the site infrastructure.

Communications architecture — copper and fibre

The site used a combination of copper and fibre communications, with each medium used where it was appropriate to the application and distance.

Copper communications were used between the inverter and BESS equipment — the short-range, equipment-level communications between adjacent components within each installation. Single-mode fibre formed the longer-distance communications backbone, linking the distributed BESS areas and wider site infrastructure back to the central O&M building and SCADA environment.

The fibre network provided the communications path needed to connect distributed equipment across the utility-scale site back to the operational control environment — carrying the data from battery storage units and site infrastructure through to the SCADA systems and the central operations room.

Copper communications cable at the inverter-BESS interface, showing the copper layer of the dual copper-fibre communications architecture
Copper communications at the inverter-BESS interface — the short-range copper layer of the site's dual copper-fibre communications architecture.

Fusion splicing and termination — approximately 220 connections

With the fibre cable already installed across the site, Omni3's scope was to complete the fibre fusion splicing and certification — producing working, tested and certified fibre communications links from the pre-installed cable runs.

Approximately 220 single-mode fibre connections were completed. The method of termination varied by equipment location: fibres were terminated into patch panels where the equipment configuration required it, or fusion-spliced at dedicated splice points directly within the equipment. Both approaches were used across the site, depending on the specific requirements of each connection point.

The work required consistent fibre preparation, splicing and termination quality across distributed equipment locations throughout the site — working within BESS units, communications infrastructure, DNO connection equipment and SCADA racks, as well as the runs back to the O&M building and operations room.

Single-mode fibre terminations and patch panel connections inside BESS equipment on the solar farm
Single-mode fibre terminations within BESS equipment — fibres terminated into patch panel enclosures with labelled connections.
Fibre patch panel connections inside solar farm equipment, showing single-mode fibre cables and terminations
Completed fibre terminations within site equipment — single-mode fibre cables neatly routed and terminated into the patch panel enclosure.

Testing and certification

Once the fibre connections were terminated and spliced, the completed links were tested and certified before handover. Testing included optical power and loss measurement and OTDR (Optical Time Domain Reflectometer) testing on the completed fibre runs.

Optical loss testing was used to measure the performance of each completed fibre connection and verify the quality of the splice and termination work. OTDR testing allowed the fibre link to be characterised along its length — identifying the position and magnitude of any reflective or loss events within the cable run, providing a trace record of each completed connection.

Certification of the completed fibre connections provided the principal contractor and the project with documented evidence of the fibre communications infrastructure — a record of what had been installed and tested, rather than an assumed assumption of performance.

Fibre optic testing and termination work in progress inside solar farm equipment during the 49 MW solar farm project
Fibre testing and termination work in progress within site equipment.

The outcome

  • Approximately 220 single-mode fibre connections completed across the 49 MW solar farm site.
  • Fusion splicing completed by Omni3 across distributed equipment locations throughout the site.
  • Fibre terminations into patch panels and directly within equipment, depending on the requirements of each connection point.
  • All completed fibre links OTDR tested and optical loss tested.
  • Certified fibre communications infrastructure provided to the principal contractor on completion.
  • Communications backbone completed between distributed BESS and site equipment and the central O&M and operations environment.
  • Specialist fibre work delivered within a utility-scale 49 MW renewable-energy project in Essex.

Related services

Note: Omni3's scope on this project was fibre communications termination, fusion splicing, testing and certification. The 49 MW solar PV installation, BESS units, inverters and SCADA systems were the responsibility of the principal contractor and other specialists.